Aswan eSIM
在Aswan,你會連上 Vodafone 或 Orange 之中在你所在位置表現較好的那一個。全國的中位速度是 29 Mbps。你的網路在落地那一刻就開始運作,比你走到入境大廳還早。
- 連線電信商
- Vodafone 和 Orange
- 埃及全國實測速度
- 29 Mbps 中位數,最慢的十分之一為 6 Mbps埃及全國 512 位旅客,近 90 天
- 5G
- 僅 4G
- 限速門檻
- 計量方案不限速
- 熱點分享
- 所有方案都可以

涵蓋Aswan的方案
| 流量 | 有效期 | 每 GB 價格 | 價格 | 購買 |
|---|---|---|---|---|
| 1 GB | 永不過期 | $239.00 | $239.00 | |
| 3 GB | 永不過期 | $153.00 | $459.00 | |
| 5 GB多數旅客 | 永不過期 | $117.80 | $589.00 | |
| 10 GB | 永不過期 | $113.90 | $1,139.00 | |
| 20 GB | 永不過期 | $90.45 | $1,809.00 |
Egypt 在 非洲 的表現
- 速度排名
- 我們在 非洲 販售的 20 個目的地中排第 11
- 區域中位數
- 29.5 Mbps
- 穩定度
- 最慢的十分之一仍有中位數的 21%
- 連線電信商
- 2 家,Vodafone, Orange
- 5G
- 4G only
- 鄰近較快的目的地
- Ivory Coast,30 Mbps
- 鄰近較慢的目的地
- Namibia,29 Mbps
- 有專屬頁面的城市
- 4 座:Cairo, Luxor, Hurghada, Aswan
- 第 10 百分位
- 6 Mbps
- 這些數字的來源
- 近 90 天 512 位旅客
抵達 Aswan International Airport(ASW)
- 機場
- ASW / HESN
- 距離
- 距 Aswan 市中心 16 公里
前往 Aswan 市區
- Abela Egypt sleeper train, Alexandria and Cairo to Luxor and Aswan
Aswan 值得知道的事
- Aswan International Airport is a domestic airport despite its name, with scheduled flights only to Cairo and Abu Simbel.
- The airport lies 16 km southwest of Aswan and is served by Egyptair, Air Cairo and Nile Air.
- Aswan has a single asphalt runway numbered 17/35 and 3,402 metres long.
- The airport was built in 1956 and upgraded by the Egyptian government in 1992 and again in 1999.
- Egypt's telecom regulator requires a foreign customer to visit a mobile operator branch with an original valid passport and a residency document. The sales agent keeps a colour copy of both.
- A foreign customer may buy a maximum of 5 voice lines and 5 data lines from each mobile operator against the original valid passport. An Egyptian may buy 10 voice lines and 5 data lines.
- Egyptian operators must link SIM card validity to the foreign customer's residency period. The SIM is disconnected one month after the residency ends if no extended document is provided.
- Egypt annulled the customs exemption for an imported mobile phone carried by a passenger from noon on 21 January 2026. The exemption continues to apply to tourists for a period of 90 days.
- Egypt gives a 90 day grace period from the date a mobile phone was activated to regularise the device. Registration of personal phones at customs is cancelled and fees are paid through digital channels.
- Aswan lies just north of the Aswan Dam on the east bank of the Nile at the first cataract. The Nile is nearly 650 m wide above Aswan.
- Aswan receives less than 1 mm of average annual precipitation. Its record high temperature is 51 C, set on 4 July 1918, and its record low is minus 2.4 C.
- The Aswan High Dam is 111 m high and 3,830 m long. Construction began in 1960 and finished in 1970. Twelve generators of 175 MW each give an installed capacity of 2,100 MW.
- Lake Nasser, the reservoir behind the Aswan High Dam, is 500 km long and holds 132 cubic kilometres of water.
- Abu Simbel is on the western bank of Lake Nasser, about 230 km southwest of Aswan, or about 300 km by road. Most visitors arrive by road from Aswan.
- Abu Simbel Airport was specially constructed in the 1970s to serve the temple complex and has year round flights to nearby Aswan International Airport.
- Egyptian National Railways was founded in 1854 and runs 5,625 km of standard gauge track. Its line from Cairo runs south along the Nile to Aswan, which the railway reached in 1898.